MPS run not producing results  
Posted: Nov 3, 2009 9:23 AM
Click to report abuse...   Click to reply to this thread Reply
Dear PP Gurus,

I have a material whose MRP type is M3. I have independenst requirements for the material. The strattegy group is 40. MRP areas is active for the Plant and it is active only at Plant level. One thing more i would like to tell you is that some storage locatisn have been excluded for MRP but some are still active for MRP. for the material MMSC bith storage locations active and inactive are assigned to material and plant combination.

But When i run MPS for the material it doesnot produce any result.
What could be the reason for it.
Do the independent requiremenst exist at storage location level.

Thanks
Dario

Posts: 381
Registered: 11/3/06
Forum Points: 636
 
Re: MPS run not producing results  
Posted: Nov 4, 2009 9:27 PM   in response to: Ashish Khurana in response to: Ashish Khurana
Click to report abuse...   Click to reply to this thread Reply
You may post this in the PP Forum.
However, check some basic points....

- How is the MD04 screen (Req. , Reservatiosn, Orders, Planned Orders, and so on)
- Is there already enough stock of the material, so no orders are required?
- MD04 should display most of the valuable information, for instance, if the reservation are at SLoc level and these SLOC are excluded from MPS.

Let us know
Dario